{"id":1898,"date":"2026-07-14T14:00:00","date_gmt":"2026-07-14T14:00:00","guid":{"rendered":"https:\/\/cnfuerte.com\/blog\/pole-mounted-fuse-cutouts-installation-selection\/"},"modified":"2026-07-15T12:12:20","modified_gmt":"2026-07-15T12:12:20","slug":"pole-mounted-fuse-cutouts-installation-selection","status":"publish","type":"post","link":"https:\/\/cnfuerte.com\/fr\/blog\/pole-mounted-fuse-cutouts-installation-selection\/","title":{"rendered":"What installation context should a pole-mounted fuse cutout review include?"},"content":{"rendered":"<p style=\"margin:0 0 16px;line-height:1.7\">A <strong>pole mounted fuse cutout<\/strong> must be selected with the same discipline applied to its installation context: pole class, bracket hardware, conductor routing, clearance envelope, and line voltage\/interrupting data belong in one review before model numbers are compared. Field disputes usually trace back to missing installation inputs, not to a one-line amp rating.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Use the <a href=\"https:\/\/cnfuerte.com\/fr\/fuse-cutout\/\">fuse cutout product line<\/a> for category context. For operating principle, see <a href=\"https:\/\/cnfuerte.com\/fr\/blog\/how-does-a-fuse-cutout-work\/\">how a fuse cutout works<\/a>. For rating vocabulary, see <a href=\"https:\/\/cnfuerte.com\/fr\/blog\/fuse-cutout-ratings-and-selection-for-overhead-distribution\/\">fuse cutout ratings and selection<\/a>.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Pole-mounted drop-out fuse cutout on an overhead distribution pole\" src=\"https:\/\/cnfuerte.com\/wp-content\/uploads\/2026\/04\/FSC-1-1-Drop-Out-Fuse-Cutout-2.webp\" \/><\/p>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 style=\"margin:42px 0 14px\">Contents<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#part-1-what-installation-context-should-a-pole-mounted-fuse-cutout-review-include\">Part 1. What installation context should a pole-mounted fuse cutout review include?<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-2-how-do-pole-class-and-mounting-hardware-drive-selection\">Part 2. How do pole class and mounting hardware drive selection?<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-3-how-should-conductor-orientation-be-planned-at-the-cutout\">Part 3. How should conductor orientation be planned at the cutout?<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-4-what-clearance-and-access-factors-belong-in-the-review\">Part 4. What clearance and access factors belong in the review?<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-5-how-do-line-voltage-and-fault-level-align-with-cutout-class\">Part 5. How do line voltage and fault level align with cutout class?<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-6-which-documents-should-match-the-ordered-cutout-installation\">Part 6. Which documents should match the ordered cutout installation?<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-7-when-does-an-fsc-1-5-enquiry-fit-a-pole-mount-specification\">Part 7. When does an FSC-1-5 enquiry fit a pole-mount specification?<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px\" id=\"part-1-what-installation-context-should-a-pole-mounted-fuse-cutout-review-include\">Part 1. What installation context should a pole-mounted fuse cutout review include?<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Pole-mounted cutouts sit at the intersection of protection design and line construction. The device must fit the pole hardware plan, support conductor routing, allow fuse link replacement, and still meet the electrical class defined by the network study.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Split the review into mechanical and electrical envelopes:<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Envelope<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Examples of inputs<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Typical reviewer<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Mechanical \/ installation<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Pole class, banding, bracket type, conductor approach<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Line designer \/ construction lead<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Electrical \/ protection<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Line voltage, continuous current, interrupting duty, fuse link plan<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Protection engineer<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<blockquote>\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Important:<\/strong> Installation context is not a substitute for protection coordination. Fuse link speed and curve work stays in the <a href=\"https:\/\/cnfuerte.com\/fr\/blog\/expulsion-fuse-link-selection-guide-for-overhead-distribution\/\">expulsion fuse link selection guide<\/a>. Source context: <a href=\"https:\/\/standards.ieee.org\/ieee\/C37.41\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE C37.41<\/a>.<\/p>\n<\/blockquote>\n<h2 style=\"margin:42px 0 14px\" id=\"part-2-how-do-pole-class-and-mounting-hardware-drive-selection\">Part 2. How do pole class and mounting hardware drive selection?<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Pole class and banding practice determine which mounting bracket geometry is acceptable in the field. A cutout spec that lists only kV and amperes but omits bracket option forces the construction contractor to improvise\u2014a common source of rework.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Record these hardware inputs on the drawing or RFQ:<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Hardware input<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Why it matters<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Pole material and class<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Defines bending and banding limits<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Bracket type (with\/without factory bracket option)<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Matches supplier accessory list<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Mounting height and orientation<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Affects access and dropout visibility<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Adjacent equipment<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Arresters, switches, or transformers sharing the pole<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">When owners standardize on a bracket family, reference that standard explicitly so bidders do not substitute unequal hardware.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-3-how-should-conductor-orientation-be-planned-at-the-cutout\">Part 3. How should conductor orientation be planned at the cutout?<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Conductor orientation controls mechanical load on the fuse tube, insulator, and terminals. The plan should show approach direction, phase sequence, jumper lengths, and whether the cutout is line-side or load-side relative to the protected equipment.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Poor orientation can produce binding during dropout, uneven terminal stress, or blocked visibility of the open position indicator.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"FSC-1-2 drop-out fuse cutout showing pole-mount hardware and conductor routing context\" src=\"https:\/\/cnfuerte.com\/wp-content\/uploads\/2026\/04\/FSC-1-2-Drop-Out-Fuse-Cutout-2.webp\" \/><\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Align the drawing with the conductor size listed in the material standard. A cutout sized for smaller conductors than those installed may require different terminal hardware or a revised model.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-4-what-clearance-and-access-factors-belong-in-the-review\">Part 4. What clearance and access factors belong in the review?<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Clearance planning must reflect owner rules, equipment spacing, and the access path crews will use to replace fuse links. This article does not replace owner energized-work procedures; it records the spatial inputs that should appear before purchase.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Review checklist:<\/p>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">Working space to operate the cutout handle and verify dropout position<\/li>\n<li style=\"margin:0 0 8px\">Separation from adjacent phases, neutral hardware, and communications attachments<\/li>\n<li style=\"margin:0 0 8px\">Grounding and bonding locations shown on the installation detail<\/li>\n<li style=\"margin:0 0 8px\">Roadway or easement sight lines if visibility from the ground is an owner requirement<\/li>\n<\/ul>\n<p style=\"margin:0 0 16px;line-height:1.7\">Document exceptions when field poles differ from the template drawing. A single generic pole detail may not cover every span in the project.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-5-how-do-line-voltage-and-fault-level-align-with-cutout-class\">Part 5. How do line voltage and fault level align with cutout class?<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Electrical class still anchors the specification. Rated voltage must cover the maximum system voltage for the application, and interrupting capability must exceed available fault current at the pole location.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Selection input<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Review question<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Maximum line-to-line \/ line-to-ground voltage<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Does rated cutout voltage class cover operating and temporary overvoltage context?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Continuous load current<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Does the selected continuous rating match conductor and load duty?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Available fault current<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Does published interrupting capability exceed the fault study value at the pole?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">Cross-check these values with the <a href=\"https:\/\/cnfuerte.com\/fr\/blog\/fuse-cutout-ratings-and-selection-for-overhead-distribution\/\">fuse cutout ratings and selection<\/a> article and the owner\u2019s protection standard. <a href=\"https:\/\/standards.ieee.org\/ieee\/C37.42\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE C37.42<\/a> provides the rating vocabulary; it does not by itself prove that any offered cutout meets a project specification.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-6-which-documents-should-match-the-ordered-cutout-installation\">Part 6. Which documents should match the ordered cutout installation?<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Before release to construction, these documents should tell the same story:<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Document<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Match requirement<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Single-line diagram<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Cutout location and orientation<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Installation detail<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Bracket, conductor approach, grounding<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Material standard<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Insulator type, hardware, fuse link family<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Nameplate \/ ordering code<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Model, bracket option, accessory list<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Spare parts plan<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Fuse links and critical hardware<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">If procurement splits cutout and fuse link orders, both packages should still reference the same drawing revision.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-7-when-does-an-fsc-1-5-enquiry-fit-a-pole-mount-specification\">Part 7. When does an FSC-1-5 enquiry fit a pole-mount specification?<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">After installation and electrical inputs are documented, a product page can start the commercial thread. The <a href=\"https:\/\/cnfuerte.com\/fr\/product\/fsc-1-5-drop-out-fuse-cutout\/\">FSC-1-5 drop-out fuse cutout<\/a> page publishes, for that model only:<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Parameter (FSC-1-5 page)<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Published value<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Voltage class<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">10\u201315 kV<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Continuous current options<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">100 A \/ 200 A \/ 300 A<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Breaking current<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">8 kA<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Creepage distance<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">220 mm<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Standard cited on page<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">IEC 60282-2<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"FSC-1-5 drop-out fuse cutout for pole-mounted distribution protection enquiries\" src=\"https:\/\/cnfuerte.com\/wp-content\/uploads\/2026\/04\/FSC-1-5-Drop-Out-Fuse-Cutout.1.webp\" \/><\/p>\n<h3 style=\"margin:28px 0 12px\">Fit Boundary<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">FSC-1-5 page data does not confirm pole suitability, bracket compatibility, or owner acceptance for your line standard. Confirm mounting hardware, fuse link selection, and fault\/interrupting alignment before treating any model as approved.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Next step:<\/strong> <a href=\"https:\/\/cnfuerte.com\/fr\/contact-us\/\">Contact FUERTE with project parameters<\/a> including pole detail, bracket preference, conductor orientation sketch, voltage\/fault study reference, and requested accessories.<\/p>\n<h2 style=\"margin:42px 0 14px\">FAQ<\/h2>\n<h3 style=\"margin:28px 0 12px\">What is a pole-mounted fuse cutout?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">It is a dropout expulsion cutout installed on an overhead line pole to protect downstream equipment using a replaceable fuse link.<\/p>\n<h3 style=\"margin:28px 0 12px\">How does pole class affect mounting?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Pole class and banding practice determine which bracket and hardware package is structurally acceptable. Specify pole class on the drawing or RFQ.<\/p>\n<h3 style=\"margin:28px 0 12px\">What mounting hardware should be specified?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Include bracket type, banding\/clamping approach, mounting height, and any owner-standard hardware part numbers rather than leaving hardware to bidder assumption.<\/p>\n<h3 style=\"margin:28px 0 12px\">How should conductors approach the cutout?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Show approach direction, phase order, jumper lengths, and terminal orientation on the installation detail so field crews match the engineered layout.<\/p>\n<h3 style=\"margin:28px 0 12px\">What clearances should planners review?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Review working space for operation and fuse replacement, separation from adjacent equipment, grounding locations, and any owner visibility requirements\u2014using the owner\u2019s live-work and clearance rules.<\/p>\n<h3 style=\"margin:28px 0 12px\">How do voltage and fault level drive selection?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Rated voltage must cover the system voltage class; interrupting capability must exceed available fault current at the pole. Continuous current must match load and conductor duty.<\/p>\n<h3 style=\"margin:28px 0 12px\">Which documents should match the installation?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Align the single-line diagram, installation detail, material standard, order code\/nameplate data, and spare fuse link plan to the same revision.<\/p>\n<h3 style=\"margin:28px 0 12px\">What RFQ inputs reduce installation disputes?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Provide pole class, bracket option, conductor orientation drawing, voltage and fault data, insulator material preference, accessory list, and applicable standard references.<\/p>\n<h2 style=\"margin:42px 0 14px\">References<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/ieee\/C37.41\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE C37.41 \u2014 Design and Application of Distribution Cutouts and Fuse Mountings Used with Distribution Cutouts<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/ieee\/C37.42\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE C37.42 \u2014 Design Requirements for Distribution Cutouts and Fuse Links Used with Distribution Cutouts<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/60509\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60282-2 \u2014 High-voltage fuses \u2014 Part 2: Expulsion fuses including expulsion fuse-links with strikers<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>A pole mounted fuse cutout must be selected with the same discipline applied to its installation context: pole class, bracket hardware, conductor routing, clearance envelope, and line voltage\/interrupting data belong in one review before model numbers are compared. Field disputes usually trace back to missing installation inputs, not to a one-line amp rating. Use the [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":1579,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1898","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"_links":{"self":[{"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/posts\/1898","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/comments?post=1898"}],"version-history":[{"count":1,"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/posts\/1898\/revisions"}],"predecessor-version":[{"id":1904,"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/posts\/1898\/revisions\/1904"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/media\/1579"}],"wp:attachment":[{"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/media?parent=1898"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/categories?post=1898"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnfuerte.com\/fr\/wp-json\/wp\/v2\/tags?post=1898"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}