{"id":1934,"date":"2026-07-29T02:00:00","date_gmt":"2026-07-29T02:00:00","guid":{"rendered":"https:\/\/cnfuerte.com\/?p=1934"},"modified":"2026-07-29T02:00:00","modified_gmt":"2026-07-29T02:00:00","slug":"surge-arresters-distribution-transformers-installation","status":"publish","type":"post","link":"https:\/\/cnfuerte.com\/es\/blog\/surge-arresters-distribution-transformers-installation\/","title":{"rendered":"Surge Arresters for Distribution Transformers: Coordination and Installation Questions"},"content":{"rendered":"<p style=\"margin:0 0 16px;line-height:1.7\">Selecting a lightning arrester for distribution transformer duty answers only half of the procurement question. The other half is physical: where the unit mounts on the structure, how the leads run, how the arrester sits relative to the fuse cutout and bushings, which grounding connection it uses, and what the crew records before energization.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">This guide covers that installation half. System inputs and device selection are handled by two earlier articles in this cluster, and both are linked below rather than rewritten here.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Polymer-housed surge arrester product context for distribution transformer installation review\" src=\"https:\/\/cnfuerte.com\/wp-content\/uploads\/2026\/04\/YH510W-15-YH510W-15J-Surge-Arrester.1.webp\" \/><\/figure>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 style=\"margin:42px 0 14px\">Contents<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#part-1-installation-questions-not-selection\">Part 1. Installation questions, not selection<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-2-decide-the-mounting-position-on-the-structure\">Part 2. Decide the mounting position on the structure<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-3-review-lead-length-and-routing\">Part 3. Review lead length and routing<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-4-coordinate-cutout-and-bushing-interfaces\">Part 4. Coordinate cutout and bushing interfaces<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-5-verify-grounding-connections-and-installation-records\">Part 5. Verify grounding connections and installation records<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-6-run-the-site-acceptance-walk-down\">Part 6. Run the site acceptance walk-down<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-7-plan-spares-and-use-product-context\">Part 7. Plan spares and use product context<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px\" id=\"part-1-installation-questions-not-selection\">Part 1. Installation questions, not selection<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Three questions arrive together in most distribution transformer protection projects: what system conditions apply, which device fits those conditions, and how the chosen device gets installed and accepted. Each question has its own evidence, and mixing them produces gaps that surface late, usually during the site walk-down.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">For the first question, the live article on <a href=\"https:\/\/cnfuerte.com\/es\/blog\/transformer-surge-arresters-coordination-questions\/\">transformer surge arrester coordination questions<\/a> defines the system voltage, grounding, insulation, and study inputs a buyer must assemble. For the second, the <a href=\"https:\/\/cnfuerte.com\/es\/blog\/metal-oxide-surge-arrester-selection-for-distribution-transformers\/\">metal-oxide surge arrester selection workflow<\/a> walks through the device-selection sequence. Start with the <a href=\"https:\/\/cnfuerte.com\/es\/lightning-arrester\/\">lightning arrester portfolio<\/a> if you need family-level orientation first.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">This page assumes those two stages produced an exact quoted SKU. Everything below asks how that SKU reaches the transformer structure in a documented, verifiable arrangement.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-2-decide-the-mounting-position-on-the-structure\">Part 2. Decide the mounting position on the structure<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Mounting position is a drawing decision, not a field improvisation. Pole-top, crossarm, transformer-tank bracket, and pad or enclosure arrangements each change the bracket type, the lead path, and the working space around the transformer, so the installation drawing should state which arrangement applies and which hardware it assumes.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Ask the supplier for the mounting dimensions and bracket options of the exact quoted SKU, then compare them against the structure drawing before dispatch. A mismatch discovered at the warehouse costs a revision; the same mismatch discovered up the pole costs an outage window.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Field crews also need the position stated in relation to the equipment already on the structure. An arrester drawn in isolation tells the crew very little about which side of the transformer it occupies, how it clears the cutout swing path, or where its grounding connection lands.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-3-review-lead-length-and-routing\">Part 3. Review lead length and routing<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Lead length belongs in the installation review because the installed path, not the catalog sheet, is what the protection review must consider at the transformer terminals. Long or looping leads add to what the review has to evaluate, which is why installation practice keeps connections short and direct wherever the structure allows.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Routing deserves the same attention as length. Record where each lead starts and ends, which conductors it crosses, and what it must clear during operation and maintenance. Keep the routing on the installation drawing so the reviewer and the crew are reading the same geometry.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"Surge arrester product view supporting lead length and routing review at a distribution transformer\" src=\"https:\/\/cnfuerte.com\/wp-content\/uploads\/2026\/04\/YH510W-15-YH510W-15J-Surge-Arrester.2.webp\" \/><\/figure>\n<p style=\"margin:0 0 16px;line-height:1.7\">Published guidance exists for this stage: IEC 60099-5 collects selection and application recommendations for surge arresters, and the project engineer applies it together with owner rules. This article does not restate clause content or numeric limits; it only insists that the installed lead arrangement appears in the reviewed documents rather than being left to habit.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-4-coordinate-cutout-and-bushing-interfaces\">Part 4. Coordinate cutout and bushing interfaces<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">A distribution transformer structure is a shared space. The arrester, the fuse cutout, the bushings, and the service conductors all claim room on it, and their relative positions are project decisions that the drawing must settle before the crew climbs.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Interface question<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">What to check on the drawing<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">What to confirm on site<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Arrester and fuse cutout<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Which unit sits where, and how the connection order runs<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Cutout operation and drop-out path stay clear of the arrester and its leads<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Arrester and bushing<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Which bushing terminal the lead serves<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Lead reaches the terminal without strain or sharp bends<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Arrester and conductors<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Clearances stated for the structure<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Working space and separation match the drawing<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Arrester and grounding<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Where the grounding connection lands<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Connector type and path match the grounding plan<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">Clearance values come from the project documents and the owner&#8217;s standards, never from a photograph or another site&#8217;s habit. When the drawing is silent on a spacing the crew needs, raise it as an engineering query instead of resolving it with field judgment alone.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Bushing interfaces deserve one extra check at delivery. Compare the connector and terminal details of the exact quoted SKU against the transformer bushing hardware, because a family-level product photo cannot confirm that the two ends actually mate.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-5-verify-grounding-connections-and-installation-records\">Part 5. Verify grounding connections and installation records<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">The grounding connection turns the arrester from a component into part of a protection path, so its conductor, connector, and route deserve the same documentation as the line-side lead. Record what the grounding plan requires and what the crew actually installed, including any deviation the engineer approved.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Records are the deliverable of this stage. A transformer arrester installation that works but leaves no paper behind cannot be audited, maintained, or repeated on the next structure.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Record<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Content<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Where it lives<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Installation drawing<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Mounting position, bracket, leads, clearances, grounding route<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Project document control<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Manufacturer instructions<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Assembly steps, hardware, and torque for the exact quoted SKU<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Supplier documentation set<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">As-installed notes<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Deviations, substitutions, and approvals<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Site quality file<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Connection record<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Line-side and grounding connections as made<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Handover records<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Photo log<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Labeled images of the finished arrangement<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Handover records<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">Fastener torque, assembly sequence, and hardware come from the manufacturer&#8217;s instructions for the exact quoted SKU. If the instructions and the drawing disagree, the conflict goes back to the engineer in writing.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-6-run-the-site-acceptance-walk-down\">Part 6. Run the site acceptance walk-down<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Site acceptance is the last point where an installation gap costs little to fix. Walk the structure against the drawing and the instruction set, item by item, before the energization request is signed.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Walk-down item<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Acceptance question<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Mounting<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Does the position, bracket, and orientation match the installation drawing?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Leads<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Are length and routing as drawn, secure, and free of strain?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Interfaces<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Do cutout, bushing, and conductor positions match the reviewed layout?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Grounding<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Is the grounding connection complete, torqued per instructions, and on the planned route?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Housing<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Is the unit clean, undamaged, and correctly labeled for the location?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Records<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Are the as-installed notes, connection record, and photo log complete?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">Energization itself follows the owner&#8217;s isolation and authorization procedures. Equipment installation does not replace that process, and the <a href=\"https:\/\/www.osha.gov\/electrical\" rel=\"nofollow noopener\" target=\"_blank\">OSHA electrical safety topic<\/a> is a useful public reference for how controlled electrical work is framed; the governing rules remain the owner&#8217;s and the local jurisdiction&#8217;s.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Treat the signed walk-down sheet as part of the handover records. It closes the loop between the drawing, the instructions, and the structure as built.<\/p>\n<h2 style=\"margin:42px 0 14px\" id=\"part-7-plan-spares-and-use-product-context\">Part 7. Plan spares and use product context<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Spare parts planning is easiest at order time, while the exact quoted SKU and its accessories are already on the table. Ask the supplier to state which items are recommended as site spares for the order quantity, and record that answer with the purchase documents instead of reconstructing it years later from a nameplate.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Product context helps route those requests precisely. The <a href=\"https:\/\/cnfuerte.com\/es\/product\/yh510w-21-yh510w-21j-surge-arrester\/\">YH510W-21\/YH510W-21J Surge Arrester<\/a> page identifies one FUERTE product family whose page-level data, drawings, and documentation can be requested for a specific inquiry.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" alt=\"YH510W-21 and YH510W-21J surge arrester product context for installation documentation requests\" src=\"https:\/\/cnfuerte.com\/wp-content\/uploads\/2026\/04\/YH510W-21-YH510W-21J-Surge-Arrester.2.webp\" \/><\/figure>\n<h3 style=\"margin:28px 0 12px\">Product recommendation fit boundary<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">A product page proves neither mounting fit nor site suitability. Bracket compatibility, terminal hardware, clearances, and accessories are confirmed by reviewing the exact quoted SKU drawing against the project installation drawing, and every rating stays on the corresponding product page for verification. Buyers who have the structure drawing, lead routing sketch, and grounding plan ready can <a href=\"https:\/\/cnfuerte.com\/es\/contact-us\/\">send the installation evidence pack<\/a> and receive an SKU-level response instead of a generic one.<\/p>\n<h2 style=\"margin:42px 0 14px\">FAQ<\/h2>\n<h3 style=\"margin:28px 0 12px\">Where is a lightning arrester installed on a distribution transformer?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">The mounting position is set by the project installation drawing: pole-top, crossarm, tank bracket, or a pad and enclosure arrangement. Each option changes the bracket, lead path, and working space, so the drawing decides, not a default habit.<\/p>\n<h3 style=\"margin:28px 0 12px\">Why do installers keep arrester leads short and direct?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Because the installed lead path is part of what the protection review evaluates at the transformer terminals. Short, direct connections keep the installed arrangement close to what the review assumed, and the as-built routing is recorded on the drawing.<\/p>\n<h3 style=\"margin:28px 0 12px\">How should the arrester position relate to the fuse cutout?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Their relative positions are a project-drawing decision. The layout must keep the cutout&#8217;s operation and drop-out path clear of the arrester and its leads, and the connection order must match the reviewed design.<\/p>\n<h3 style=\"margin:28px 0 12px\">What clearances apply around a transformer arrester?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Clearances come from the project documents and the owner&#8217;s standards for that structure and voltage. This article states no numeric values; when a needed spacing is missing from the drawing, raise an engineering query.<\/p>\n<h3 style=\"margin:28px 0 12px\">What should a site acceptance check cover before energization?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Walk the structure against the drawing and instructions: mounting position and bracket, lead length and routing, cutout and bushing interfaces, grounding connection, housing condition, and the completeness of the as-installed records.<\/p>\n<h3 style=\"margin:28px 0 12px\">What installation records belong in the handover file?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Keep the installation drawing, the manufacturer instructions for the exact quoted SKU, as-installed notes with approved deviations, the connection record, the photo log, and the signed acceptance walk-down sheet together as handover records.<\/p>\n<h3 style=\"margin:28px 0 12px\">What spare parts should buyers include with an arrester order?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Ask the supplier to state a recommended spares list for the order quantity and site conditions, and file that answer with the purchase documents. This article does not prescribe a universal list because accessories differ by SKU.<\/p>\n<h3 style=\"margin:28px 0 12px\">Can a product photo confirm that mounting hardware fits?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. A photo shows a product family&#8217;s general form. Fit is confirmed by comparing the exact quoted SKU drawing and hardware details against the transformer structure drawing before dispatch.<\/p>\n<h2 style=\"margin:42px 0 14px\">References<\/h2>\n<ol style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">Standard scope for application recommendations: <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/33842\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60099-5, Surge arresters \u2014 Selection and application recommendations<\/a><\/li>\n<li style=\"margin:0 0 8px\">Electrical safety-process context: <a href=\"https:\/\/www.osha.gov\/electrical\" rel=\"nofollow noopener\" target=\"_blank\">OSHA electrical safety topic<\/a><\/li>\n<li style=\"margin:0 0 8px\">Overhead distribution industry context: <a href=\"https:\/\/www.utilityproducts.com\/2206-overhead-distribution-systems\/\" rel=\"nofollow noopener\" target=\"_blank\">Utility Products overhead distribution systems section<\/a><\/li>\n<li style=\"margin:0 0 8px\">Public terminology context: <a href=\"https:\/\/en.wikipedia.org\/wiki\/Surge_arrester\" rel=\"nofollow noopener\" target=\"_blank\">Wikipedia: Surge arrester<\/a><\/li>\n<\/ol>","protected":false},"excerpt":{"rendered":"<p>Selecting a lightning arrester for distribution transformer duty answers only half of the procurement question. The other half is physical: where the unit mounts on the structure, how the leads run, how the arrester sits relative to the fuse cutout and bushings, which grounding connection it uses, and what the crew records before energization. This [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":1434,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1934","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"_links":{"self":[{"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/posts\/1934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/comments?post=1934"}],"version-history":[{"count":1,"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/posts\/1934\/revisions"}],"predecessor-version":[{"id":1990,"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/posts\/1934\/revisions\/1990"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/media\/1434"}],"wp:attachment":[{"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/media?parent=1934"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/categories?post=1934"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnfuerte.com\/es\/wp-json\/wp\/v2\/tags?post=1934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}